CRUSADER
Gold Member
I gridded just over 1/2 Acre today in 5 hours. I had 50 buttons, so 1 every 6 minutes average. With all the junk I was probably putting stuff in my pouch every 2-3 minutes. So you can easily work out its not Low & Slow for me, I would rather cover the area quickly. Something that suits my ploughed field MO. Something to think about if you spend a lot of time on your knees with a pin-pointer. A pin-pointer wastes precious time, in a ploughed field your best learning without it.
Broken Jetton
Neolithic Flint
Livery Button
1960 Pigeon Ring
1575 Lizyy Sixpence (heavily clipped)
Cut Qrter Hammered Short-cross type
Broken 1686 foreign hammered
Broken Jetton
Neolithic Flint
Livery Button
1960 Pigeon Ring
1575 Lizyy Sixpence (heavily clipped)
Cut Qrter Hammered Short-cross type
Broken 1686 foreign hammered
Attachments
Last edited:
Upvote
24