June 1, 2012 – Due to rough weather and some equipment concerns on June 1, the dredge Charleston was moved from the borrow area to Clearwater Pass. The active project along the beach is located at about 1520 Gulf Blvd. (R-59). The dredge is expected to resume work at the borrow area by June 7th or 8th depending upon weather.