Trommel building

DignMove

Tenderfoot
Joined
Sep 20, 2016
Messages
7
Reaction score
7
Golden Thread
0
Location
Batavia
Primary Interest:
Prospecting

Attachments

  • 1475716387099.webp
    1475716387099.webp
    80.4 KB · Views: 240
I take it this is for a portable unit. Nice looking work! 8-)
 

I think this will house the tumbler just fine .....all the main body pieces coming together
 

Attachments

  • 1477338707447.webp
    1477338707447.webp
    31.6 KB · Views: 224
  • 1477338855803.webp
    1477338855803.webp
    44.1 KB · Views: 235
If the lower section is going to be the sluice then how big is your pump? Looks like you're classifying from 4" to 1¼", where 4" to ¼" would work for a small 1500gph bilge pump. If you're running it off of a Honda WX15 that should be more then enough but a WX10 may not be enough to move the rocks out of the sluice.
 

It's a 19 1/2"x6" drum with 5/8" expanded holes it will run down over a 8x8 section of 3/8" expanded down into a water bed before dampered with a piece of rubber the sluice continues as 8" x 36" debating on added a 12"x 24" section as for pumps I want a honda but funding may cause dual 1100 bildge pumps lol
 

Top Member Reactions

Users who are viewing this thread

Back
Top Bottom