Jason in Enid
Gold Member
- Joined
- Oct 10, 2009
- Messages
- 9,581
- Reaction score
- 9,205
- Golden Thread
- 0
- Primary Interest:
- All Treasure Hunting
Asking for advise from anyone who has contracted out build work for any of their mining equipment, who did you use that you were really happy with?
In the past, a lot of people highly recommended Heckler, but I have to say I am NOT impressed. I emailed a full description of what I needed back in may, and never heard a reply. A few weeks later I called and talked to Greg, and we got everything ironed out, including a 5 week expected time. 3 weeks later I still have no payment invoice so I call again (more apologies from greg) and he tells me he will get the invoice out to me. A week later, nothing. call back and finally get an invoice that night (with the wrong product description). Call and talk to someone else about the description, says greg will call me to verify. Now, here it is about 12 weeks after all this started, and a week after greg was supposed to call me back. I call and the work still hasn't been started. He says in the next few days. I say this isn't a good way to run a business.
Once I finally get this done, I'm not calling Heckler back, So, who do YOU use that you are happy with? and don't say to do it myself, I don't have a welder, the jigs, or metal fab equipment to do any manufacturing myself.
In the past, a lot of people highly recommended Heckler, but I have to say I am NOT impressed. I emailed a full description of what I needed back in may, and never heard a reply. A few weeks later I called and talked to Greg, and we got everything ironed out, including a 5 week expected time. 3 weeks later I still have no payment invoice so I call again (more apologies from greg) and he tells me he will get the invoice out to me. A week later, nothing. call back and finally get an invoice that night (with the wrong product description). Call and talk to someone else about the description, says greg will call me to verify. Now, here it is about 12 weeks after all this started, and a week after greg was supposed to call me back. I call and the work still hasn't been started. He says in the next few days. I say this isn't a good way to run a business.
Once I finally get this done, I'm not calling Heckler back, So, who do YOU use that you are happy with? and don't say to do it myself, I don't have a welder, the jigs, or metal fab equipment to do any manufacturing myself.
Upvote
0