I was one putting a hot tub on a second floor deck. I took the heavy log railing off so I could have a crane slide the tub between the uprights and it all went to plan just fine. Later that day I put the top horizontal log in and it fit just right and held there because of the pressure between the uprights. I put the lower horizontal log in place and began to tap it in. I'm sure you've already figured it out. The lower log released the pressure from the upper, and it came down on my head. I was out cold for about 60 seconds, and then I woke up on the front lawn, a full story below.
I was alone when this happened 10 years ago and this is the first time I've told anyone. I was married at the time and would have heard about it forever.
I was alone when this happened 10 years ago and this is the first time I've told anyone. I was married at the time and would have heard about it forever.