fausel71
Tenderfoot
- Joined
- May 29, 2013
- Messages
- 3
- Reaction score
- 0
- Golden Thread
- 0
- Location
- Rockingham NC
- Primary Interest:
- Prospecting
So I am going through the process of converting my Jobe 45 Yellow Jacket to all Gold Hog matting and adding a 2" Jobe Crash Box header for dredging. I have previously used UR mat under the existing expanded metal and riffles, but was never quite satisfied with all the extra components/parts cleaning during clean up. (As a sluice box only.) Keep in mind that when I lose the flare my box will be 36" long. (10" wide) I'm looking to make a light/portable dredge for playing in the creek prior to coming to work. (I work 2nd shift) The pump is the same on Doc recommends for the Mini. (52 Gpm/3000 Gph)
So the question is I know I'm going to use a piece of UR under the crash box, but was considering one of 3 options.
1. UR, SC, RB, SC, RB, RB. (Most likely setup.)
2. UR, RB, RB, RH, RH, RH.
3. UR, SC, RB, SC, RB, SC.
Looking for input? Suggetions, complaints, etc... Keep in mind I am limited by size. (length here/ 36" = 6 pieces)
This could be helpful to others considering the same conversion.
So the question is I know I'm going to use a piece of UR under the crash box, but was considering one of 3 options.
1. UR, SC, RB, SC, RB, RB. (Most likely setup.)
2. UR, RB, RB, RH, RH, RH.
3. UR, SC, RB, SC, RB, SC.
Looking for input? Suggetions, complaints, etc... Keep in mind I am limited by size. (length here/ 36" = 6 pieces)
This could be helpful to others considering the same conversion.
Upvote
0