Simplest way is to use a 5" suction nozzle off the shelf then run a 3/4" garden hose from the pump with a blaster nozzle and shut off valve on the end of the hose to where you want to dry land dredge. The separate hose with blaster nozzle will do a much better job of cutting into the dryland and packed gravels than any hydroforce nozzle.
Once you have a pool of water and loose material use the suction nozzle in one hand while continuing to use the blaster nozzle in the other hand.
If you want to build the suction nozzle yourself, then for a 5" suction nozzle you would need a 2-1/2" pressure hose with a 5/8" inductor jet.
I was not impressed with the hydroforce nozzle. Using a separate hose worked best for me, but I was only using a 3" suction nozzle.
If using a separate hose does not appeal to you then here is a design you may want to try.
After thinking about it, I'm not sure you can keep a 5" suction nozzle supplied with enough extra water pumping through a 3/4" garden hose

Worked well with a 3" nozzle but had to start out with a decent pool of water in advance. A 5" sucks way more gpm ! For sure a 5" will move a lot of material like a small sized hydraulic operation.
Have you priced 5" suction hose?
GG~