- #1
Thread Owner
Was the office building of a trucking company. Three story building that had an addition put on the back that basically doubled the length. Also had a truck garage behind it that was attached to the building by a long roof. Building was in an area with high taxes, no one was interested in buying it because of that. So the owner decided to knock it down. Got there a 1/2 hour after the start, but was a small crowd. I ended up getting all the plumbing and wiring in the entire building for $130. Did get enough tubing from the basement to pay what I paid for it. Also got two electrical services full of breakers for $30 and $50. Kinda sad whole, rooms with oak trim and Anderson windows were going for $5-10. Now just to get it out. Too bad copper dropped. Looks like I'll be sitting on it for awhile.