Those pics were on a claim we tested that wasn't ours. The only thing to run were gravels under the old hand stacked rock tailings from the old timers. We ran a 20 yard test & got 3.5 grams. About $7/yd which is not good. We are going to our own claims in July to run much better gravels. We are expecting $20 - $40 per yd. Keeping fingers crossed. The washplant will process 15 - 20 yds/hr. We have two excavator operators - one full time & one part time. There is also a skid steer & a 9 ton rock truck. So at present we have 3 guys on site at all times & 4 on weekends. One of the full timers is a retired mechanic who I call the most valuable person on the mine. We are all in our 60's except for the part time operator. Trying to make the dream come true.
The hopper feeder is a custom made unit from Gold Claimer in Minnesota. The wash plant combines a vibrating hopper deck that feeds the trommel. Course tailings at the back end of trommel are removed with a conveyor. Everything is electric & run off a diesel generator. The excavator is a Kubota 80 which is like a small mid size. Skid steer is a Kubota 70 series. There are 2 water pumps, a 3 inch gas 19,000 gph & a diesel 4 inch 29,000 gph which feeds the trommel. The smaller gas pump is used for water transfer to our holding pond. Everything is new except for the rock truck.