What's new

NEW CONTEST

I'm Baaaack in the saddle again!
I'm Baaaaaaa@k! In
Laaaaast

Sent from my SPH-L720T using Tapatalk
 
Two over easy and an english muffin
 
Time to finish the rough in wiring on the bathroom remodel......or.....take a nap?
 
Good for you fish. I'm getting ready to dig out my electrical service to my garage.
 
Winter pontoon prep, tarp on, dock out of Lake and garage cleaning today. Temperature is up a little.....time to get wet!

Sent from my SPH-L720T using Tapatalk
 
I am getting my apartment clean today.
You should call those dial a maid cleaning services....those ladies will come and clean your apartment for you....lol
Last

Sent from my SPH-L720T using Tapatalk
 
Electrical rough in complete and started the bath exhaust run and skylight. When that gets done it will be time to re insulate vapor barrier and sheetrock. Then mud/tape sand paint wainscot tile flooring cabinets set shower trim touch up paint vanity mirror lighting pocket door toilet towel bars paper holder.....

Thats alot just to brush my Damn teeth, go potty, and take a shower!
 
I'm freeeeee.
Free Lasting

Sent from my SPH-L720T using Tapatalk
 
Time to shower up and get some comfy clothes on and enjoy a bowl of home made chicken soup that has been simmering all day. Maybe a grilled cheese sandwich to accompany it.
 
Time to shower up and get some comfy clothes on and enjoy a bowl of home made chicken soup that has been simmering all day. Maybe a grilled cheese sandwich to accompany it.

Offering or bragging.
 
Offering or bragging.
I don't care if he is bragging....I just want to know if he went all in and did up the grilled cheese sandwhich

Sent from my SPH-L720T using Tapatalk
 
Got a call just as I was thinking Nap today.
It was from my neighbors. They were bringing over the equipment needed to dig a trench to run a new electric line to the garage. Yep, 5 hours later, trench dug, electric line installed, trench backfilled. All part of the preparation needed prior to the installation of a new driveway to the barn.
Last.
 

Attachments

  • 20171104_220740.webp
    20171104_220740.webp
    1.4 MB · Views: 62
  • 20171104_220826.webp
    20171104_220826.webp
    1 MB · Views: 74
  • 20171104_221026.webp
    20171104_221026.webp
    1.1 MB · Views: 50
  • 20171104_221129.webp
    20171104_221129.webp
    1.6 MB · Views: 56
  • 20171104_221102.webp
    20171104_221102.webp
    1.7 MB · Views: 50
Last edited:
Good work wind. Looks like you are on top of things as usual. Hope it all went well.
Last

Sent from my SPH-L720T using Tapatalk
 
Well, the power is back on and nothing blew up.
The idea behind running a new line is the depth. The old line was only 6 inches deep. The new line is down 30 inches. That put it into the hard pan, and won't be in the way when the surface soil gets scraped off. I have to put at least an 18 inch depth of gravel in preparation for the driveway to the barn.
 
One thing I know....
Last

Sent from my SPH-L720T using Tapatalk
 
Keep thinking you are LAST and maybe one day you are.
 

Users who are viewing this thread

Back
Top Bottom