Don't forget to add in the blasting permits, etc. when you start thinking about opening up the cemented highgrade channel. Driving a skid steer every day is tough, maybe move up to an 1120 or larger Volvo for some comfort and less back and body stress. You guys know what you can handle, just trying to make it comfortable work for lots of long days. I wouldn't want to be stuck in a small skid steer trying to run it faster then it was designed for unless I was stock piling a day or 2 ahead for speed and then just running and feeding the plant a few times a week.
Edited...
You're talking about a gold claimer that has a simple sluice box for the recovery. Is it designed to catch the size of fine gold that you are talking about?
You really should call the guy in Az and talk about his whole Goldfield system. I've ran Goldfield equipment also and its top of the line. Here's the add
PROCESSING EQUIPMENT
FOR SALE IN CONGRESS, AZ
1- Goldfield 25 ton per Hour Trommel wash plant used very little, excellent shape. -- $25K
1- Goldfield jig with finishing jigs, brand new condition, barely used. -- $59K
1- Nelson 30 Centrifuge with Stainless Steel bowl, hooked up but never used, new condition. -- $28K
1- Deister Model #6 concentrating table 6’x15’ deck, 10’x20 overall, 3hp 230/460v 3PH, mounted on heavy-duty skid. -- $20K
2- M-7 Shaker tables, brand new, never used or assembled. -- $4,500 each
1- MSI Mining Xtruder 255 table, barely used, new condition, was MSI’s demonstrator originally. -- $18K
1- Alpha Laval Rotary vacuum filter, Model TF-8M2, stainless food grade, complete with all pumps & accessories. -- $21K
I took out the rest of the information because you can't sell on here.
Reed