this is a basic breakdown of my process :
called waterboard for my region , spoke with mining engineer , apologized for my ignorance , asked for direction on how to complete process correctly , called forest service for my district , apologized for my ignorance and confusion , explained my situation to both parties , received p.o.o. application , filled out completely , included map , hand drawn diagram , pictures , video on cd of trommel and trommel water consumption requirements , average run time per day , provided to both agencys , they coordinated an on site inspection , determined my plan to be not harmful , I have no fish or lizards or frogs , no surface disturbance , due to refilling my holes , work confined to dry riverbed sections , water will percolate through gravels , filter out , re-enter steam clean ,
don't run motors non stop , prepare all your materials , then fire up , run materials and shut down , no need to fill 2 buckets and go run em , fill 20 or 100 , then run em , let your box run correctly , don't rush it , just get it done , and shut down , clean out , repeat daily, I average 40 or so buckets a day , can run em all in 1 hour or so , hence the preparation NOT much run time , agencys like minimal , also fuel effecient
fuels always stored and used over catch bins for spillage ,
have a personal restroom in my camper for human waste ,
plan based on exploration not production, much more lenient permit ,
be polite , they have the power , explain how you wish to comply with all rules
no appropriation permit required , no diversion or alteration happening so also not required ,
plan determined "best left to f.s. supervision , under best management practices " requirements ,
which means : be environmentally conscious , use common sense , take good care of your claim , you are the steward of the land , represent all miners in a positive light (or hurt us all)
hope this helps anyone , trying to proceed