prospectordamon
Full Member
- Joined
- Mar 31, 2011
- Messages
- 246
- Reaction score
- 5
- Golden Thread
- 0
- Detector(s) used
- White's MXT/6X10 DD Coil/950 Coil
- #1
Thread Owner
need to know how many holes and what size holes need to be in my spray bar application for my highbanker build. I am using 1.5" pipe. motor/pump specs are as follows:
9060 gallons per hour (151gpm)
Total head lift: 97.5 ft.
Suction head lift: 26 ft.
I want to run 2 rows of holes on each spray bar and of course have them jet across and make a "V" where the material will be dumped into the hopper. Any ideas or useful links with calculations on figuring this out? It sounds too simple to have calculations for but I want to be sure its right the first time! Thanks
9060 gallons per hour (151gpm)
Total head lift: 97.5 ft.
Suction head lift: 26 ft.
I want to run 2 rows of holes on each spray bar and of course have them jet across and make a "V" where the material will be dumped into the hopper. Any ideas or useful links with calculations on figuring this out? It sounds too simple to have calculations for but I want to be sure its right the first time! Thanks