chalkoutline
Hero Member
- #21
Thread Owner
Armchair,Chalkoutline, gravelteeth
Just noticed in the Mccully letter that it's a DOUBLE floor in the storage area, i.e. 4" oak, 6" spruce (?) pole. This can handle a very heavy load, maybe even a dirt column 100' high (no platforms).
C - still confused
Are you saying the platforms were installed on the way down? How could you have your cribbing advance downward at the same time?
Seems like the the choice is platforms, or cribbing, or neither.
In thread "Oak Island Treasure Revelations", post #73, i detailed 2 methods for a pre-1700, 100ft vertical shaft WITH CRIBBING . These methods are no longer considered safe so a third method is in use and used to construct the COOI garden shaft.
In this thread i decided to share my analysis of how to dig a 100ft vertical shaft WITHOUT CRIBBING. It is strictly MY analysis because I could not find any evidence or examples that used no cribbing.
MY analysis is based on two unsubstantiated claims:
Claim 1: the depositors dug a 12'x12" shaft in the virgin, unworked clayish till found on OI.
Claim 2: every 10ft the depositors dug a horizontal niche, 1ft deep into the side of the shaft wall to accommodate 14ft logs for platforms.
There was no information provided on whether the log platforms were placed going down or up. All we know is in 1795 3 boys found log platforms every 10 feet which everyone i spoke to and comments on this forum, that these platforms spanned and covered the entire 12'x12' shaft.
Figure 2 provides more detail Armchair's conclusion that the platforms found by the 3 boys could only have be placed when filling the shaft.
Figure 1 shows 14ft logs could have be lowered diagonally and slid into horizontal niches BUT this method can only achieve a "half platform".
So it is possible and does makes sense the depositors used "half platform" to dig the shaft but used the method shown in Figure 2 to close the other half of the platform when filling the shaft.
Before everyone goes running off saying i proved the platforms to be true, keep in mind that the "half platforms" blocked the depositors ability to fill the shaft. So they would have had to either
1. bucket the dirt back down and fill under the half platforms OR
2. After tossing dirt down the open part of the shaft they would have had to send men down to fill in under the "half platforms" and then lower logs to fill in the other half of the platforms.
In either case there would certainly have been voids/air gaps under each platform once the dirt settled.
Once again i reiterate, all of this analysis is based on the depositors ability to
1. dig 1ft deep niches in the shaft walls, install 14ft logs without compromising the integraty of wall supporting the logs.
2. That during the daily activities of traversing the shaft and raising/ lowering potentially 300lbs buckets didn't cause a platform(s) to fail.
This begs the question...if a "half platform" failed, how would they replace it. The till that used to support the platform would be gone!
Many, many holes in the NO CRIBBING theory. Therefore, until someone can produce evidence that the depositors could have indeed dug a 100ft shaft without cribbing, i have to conclude the MP story is not true...You must use cribbing!
Any theory based on the NO CRIBBING theory is equally false.
-CO